AEK Marble Factory Digital Twin
Libya
First-of-its-kind digital twin in Libya, connecting 3 factory hangars into one operational command hub.
A vertically integrated marble producer modernized with an interactive digital twin, connecting machines, material flows, and quality systems in one view. The twin spans three hangars, from raw block sourcing through slab manufacturing to specialized fabrication. A centralized command interface delivers factory-wide visibility; a simulated 3D environment tests workflow changes without physical risk; immersive overlays bring live performance data to remote teams.
Impact
- Predictive maintenance replacing reactive operations
- Risk-free virtual workflow optimization
- Remote diagnostics and staff training with live KPIs
Tell us about your project
Send a plot plan, a render or a photo of your space. We reply the same working day.


